Interactive playbook · cross-sector

The red programme
you just inherited.

You’ve been handed a programme that’s already red. Multiple vendors, an SKI framework agreement that locks you in, a steering committee that meets monthly to watch it get worse, and a board that reads about it in Version2 before it hears it from you. Here is exactly how I’d take the first 90 days.

What red actually looks like.

  • Time, cost and scope have all blown past what anyone will admit out loud.
  • The SteerCo reviews the same amber slide every month; nothing moves.
  • Vendors have read the contract more carefully than you have.
  • Everyone is busy. No one is deciding.
  • The real conversation about the programme happens in the car park, not the meeting.
  • Someone already owns the failure — and they’re still in the room.

Not sure how red yours really is? Take the 2-minute check · or see what the delay is costing you →

Control → Stabilise → Correct.

A turnaround isn’t a Gantt chart — it’s a sequence of decisions made in the right order, against people who don’t all want the programme to succeed. Click through each phase: what I do, the political reality nobody writes down, and the tools I reach for. This is my Control · Stabilise · Correct method in motion.

Control

Get the truth. Decide honestly whether it can be saved.

What I do

  • Run a fast, diplomatic assessment — the real scope of the mess, not the reported one.
  • Find the root causes: unclear decision rights, diluted accountability, slow escalation.
  • Map two org charts — who’s accountable, and who actually decides.
  • Say the unsayable early: recoverable, or should it be stopped?

The political read

  • Someone owns this red status. They’ll help you in the meeting and undermine you in the corridor.
  • The board wants a scapegoat almost as much as a solution — don’t become it.
  • The vendor is already positioning the contract as your problem, not theirs.
Tools engaged Root-cause assessment Stakeholder mapping PMI recovery: Control Contract & SLA review

Bending a red programme back to green.

Illustrative — the shape of a turnaround, not figures from any engagement. The decline halts in Control, the line lifts through Stabilise, and Correct carries it into delivery.

Programme health trajectory across the first 90 days An illustrative curve rising from “at risk” at Day 0, holding through Control, lifting through Stabilise, and reaching “delivering” by the end of Correct. Delivering Stabilising At risk Control · Days 1–7 — truth established, decline halted Stabilise · Weeks 2–4 — governance reset, plan signed Correct · Weeks 5–12 — delivering, trust rebuilt Day 0 Control Stabilise Correct
Illustrative trajectory — the shape of a recovery, not figures from any engagement. Hover a phase for detail.
Outcome

A programme that was heading for the Rigsrevisionen shelf, restructured and delivered instead — governance rebuilt, timeline recovered, and a board that trusts the reporting again. That’s the signature: not a rescue plan, a rescue.